Updated 3/11/2025:
I took a break from weathering today (actually there was a lot of non-modeling "stuff" going on) to spend a bit of time on the pipe bridge that will go between the Open Hearth and the Strip Steel mill.
Here is part of the structure under construction on the bench. I built the upright "H" supports first and am now stringing them together longitudinally. Wish it was a bit straighter, but most of it will be between the buildings and the top will be the most visible. What I really needed here was a Kenner Girder and Panel kit! Hey, who remembers those?
And I also did some work on the large pipes that will feed Coke Oven Gas or Blast Furnace Gas into the Open Hearth.
More when I know it.
George