The meters seem to be reading fairly accurately and appear to be working. I don't get it? I can't see how the short was getting backward through the PSX with the meters on the output of the PSX and not when the meters were on the input of the PSX? I would think it has to be something with the meters though?
I'm considering Moonman's suggestion of calling the PSX folks to see if they can shed some light on what is happening here.
I just ran a longer signal test with the current configuration (3nd picture) and had all 10's for 3 laps around each track at 15 smph. On the first lap of the outer track it dropped to 9 on one curve section, but was 10 for the next 2 laps. Tis was with a PS3 engine, I don't have any PS2's out right now, still packed away from last years move (I'm a little behind schedule, train is running late so to speak).
Not sure I need them, but what choke should I use to add on to each TIU channel? Any recommendations would be appreciated as I don't know how to size these things.
I will probably be ending up with all 4 TIU channels being used, so I would like to get 4 chokes now, just in case they become needed later on, or the PSX's get moved to the TIU outputs. I don't see a need to move them yet, but if anyone has advice otherwise, I can easily move them and will already have the chokes to add.
Thanks for any and all input.