Just checked in about 25% of the Rail Sounds Dialog controls. This one was fun, as I can now trigger engineer to tower and tower to engineer dialogs. Combined with the speed commands, this means one can now trigger "ok to change speed" "yes, change speed", change the speed, and then ack back to the tower the speed change!
-- Dave