I have to agree with Dave everyone is doing great work!
@Strap Hanger nice work on the military car! What is the load going to be?
@luvindemtrains Dave nice work on the crossing signals! how many did you install on your layout and was it really hard?
Well not much for me folks, I would take photos but you all know what an outlet looks like! LOL Well yesterday I finished wiring in all 14 outlets in my train room. All are controlled by one single on/off switch! That way there is no way of leaving anything on when I leave the train room!
Also after talking to a forum member here I have reached out to a pole barn builder or construction engineer to see if I can remove the 8 x 8 post in the train room. I really doesn't look like it is doing anything. It use to be the center post of the back wall when the shop was built, but then at some point in time the extended the shop by 15 feet and just left the post.
Well either way I hope you all find time to have fun with your layouts and trains!