Skip to main content

Reply to "WHAT’S ON THE WORKBENCH AT THE MOMENT"

@coach joe posted:

K-Line Plymouth NYC No. 34 progress.  As previously posted bent and missing handrails had been replaced and it was time to replace the large operating couplers with scale couplers so this little critter could pull the train it came with.  The scale draft gear for theses Plymouths is different than any other scale coupler draft gear even K-Line by Lionel's own scale coupler part number 6-22369.  Luckily Bob, @RSJB18, had a set.  One coupler was broken but would look okay on the front and the other would go on the back to connect to the train.  Well that coupler broke too but Our friends at Trainz.com, the current repository for K-Line spare parts had K-line HO metal couplers that were just what I needed.

Step one, replace broken couplers.  Check

IMG_4082IMG_4083

Step 2 remove foot boards to remove and replace lobster claws.  Wait, not on the front end, which apparently took the brunt of some sort of collision.  Foot board was snapped off, as were the front markers, missing ladder rail and bent handrail.  Luckily the screws were still in place.

IMG_4084IMG_4085

Scale coupler in place

IMG_4086

New, white foot board from NYC No.80 spare parts lot had won last year.

IMG_4087IMG_4088

New front coupler, foot board and handrails

IMG_4089

Before photo of the rear coupler.

IMG_4090IMG_4091IMG_4092New rear coupler and footboardIMG_4093

Nice work Joe! If I ever get something like that it's nice to know between @RSJB18 Bob and you will have all the answers! 😀

×
×
×
×
×