Skip to main content

z1000, Powerhouse 180, and TIU Questions

Starting to wire up a more perminent layout and need some insight. I'm using DCS for the majority of the layout but will have a small independent loop for my postwar and prewar trains. I've already had great success using the Lionel 180 watt powerhouse supplies to provide track power through the TIU for both conventional and DCS operation. Since this will be more than just the carpet central I've had for the last few years, I would like to use my spare z1000's 14v terminals to power accessories as well as switches. I'm pretty sure that in and of itself will be fine but can I also power the TIU from the 18v barrel connector without an issue? I know I can leave the TIU powered by the Lionel supplies or get a wall wart to power it but since that connector is already there, i'd like to utilize it if possible.

Original Post
×
×
×
×
×