Hi, I have never had a layout. I was used to adding my Legacy Engines to my Command Base with the little plug in orange cartridges Lionel no longer supplies. I have about 30 engines that only act as Command Base 1 because I don't know how to load their data to make them act as Legacy engines that they are.
I am sure the answer may be simple, but I don't know how to do it.
i have a large oval of 60 inch curves on the carpet. I had to glue all the curves to each other so they would stay together. About 7 straights in the long direction.
Can anyone provide an answer? Thanks in advance. Do I need those tracks that can read train data? How do they hookup to the base? I have 2 of these in a box somewhere.
I just moved into a house, so most things are in a box somewhere, I have a 4 car garage full of boxes, and a very Large basement half full of O and G scale trains, with a few boxes of N and Z added in for good measure.
Thanks in advance. An old guy who has never had to do this before without the orange data chip! 30 engines for real to add as legacy somehow!