A little better look. Probably a two inch pipe.
Pipe is missing from the other side. In and out to a pre-heater that tempers, heats the cold water before it is added to the boiler.
This Pennsy locomotive is also super heated, where saturated steam is dried, heated to a higher temperature by re-introducing the steam to additional flue heat with additional tubing. More energy.