Skip to main content

Reply to "Blackwater Canyon Line - March 20, 2025, Brick Street Extension Planning"

@mike g. posted:

Hi Mark I really like the idea of tying it into the far track under the station. But I also want you to know that if you wanted to put another scratch built bridge going back to the end of the yard that the actuator is definitely powerful enough. I use mine to lift 3 bridges at one time.

Thank you, Mike!  I was thinking that very thing that the actuator could handle it and I could just use a crossarm from the other bridge to lift the third bridge.  It certainly would work, and without a lot of trouble.

Last edited by Mark Boyce
×
×
×
×
×