Guys,
I have underway a layout based on the Northern Central/ Northern Division of the PRR. It centers around Northumberland yard with the branch to Mt. Carmel that featured heavy I1 activity. I am keeping a blog on my progress and you can view that at the bottom of this post. It goes back about 3 years to when I started posting. The track plan took about 1.5 years to get done in 3rdPlanit. The tracks rise from a low of 40 inches from the floor (a hidden 8 track through holding yard on the main line) to about 80 inches from the floor (a hidden loop of 6 tracks hanging from the ceiling repressenting Mt. Carmel). I have most of the benchwork done but have not completed the line to the ceiling alothough the loop is in. You can see how I made it. I am now building the engine terminal area and soon will start heavy wiring work.
I am looking for anyone who has pictures alng the right of way for areas such as Crowl, Weigh Scales, Herdon, or Milton PA. I am modelling mid 1955 so that is the era preferred.
Thanks for the help in advance.
Jim Taverna