Been following this thread with great interest.
For me, I'm just putting in a loop of 2 rail track. Cheaper and easier. I've got enough 3R projects to build that turning drivers and stuff just doesn't sound appealling.
Plus, after all the effort to make it 3R, I'd still need command control, which is another expense. I know some will say I don't need it, but I like it and the sounds. More than I want to do with this project.
I just want to run a 2R locomotive because its never been made in 3R.
It hasn't been this thread changing my mind either-I've thought about this for some time and bob2 nailed it when he posted about just installing a loop of 2R track (which I've thought about many times). I've got rolling stock, just need to change the trucks to 2R.
I'll still follow this thread for the great info, but a 2R loop is so much easier.
Only danger is I like 2R track and it looks better I can easily see this snow balling into a 2R layout.