What are your thoughts on using Homasote on the entrie layout vs. just using it under the track? I have an 8' x 23' layout and at $27 per sheet, if there is no benefit to covering the whole thing why spend the money?
If you've only used Homasote under the track, how do you handle detailing or placing other structures that would be sitting 1/2" lower than the track?
Thanks
Matt
Original Post