Skip to main content

This layout plan updates Lionel's D-131 display layout with Fastrack and some modern ideas.   It begins with the two loops of the D-131, but with Fastrack at O-36 and O-48 diameter curves, adding crossovers between the two loops with high-speed O-60 turnout pairs.   A passing track and station are added and an industry spur.   A second industry spur is added to service Menard's Morton Salt tower and Lionel's coal loader.

Other traditional accessories are included from the D-131:   the operating cattle pen, the milk can unloader, and the rotating beacon.  A freight station or other industry is served by the On30 narrow gauge loop replacing the small mountain loop and trestle of the D-131, which uses Kato HO Unitrack (but another track could be substituted) of 17" radius at 6" elevation.

I hope you enjoy this layout plan - comments and suggestions are very welcome!

M59-04V1b

Attachments

Images (1)
  • M59-04V1b
Last edited by Ken-Oscale
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×