Skip to main content

I took the "C" shape and bridged it with a 4x8 sheet of plywood.  I built support between the two sections but ran out, so the middle front has about a foot deep area that needs filled in with 1x4 framing yet.  Strong enough to run trains though!  I assembled the basic loop and fired up the 2333's.   Was good to see them run again.  Haven't been able to run O gauge trains in several months.    Mike

20170512_111858

Attachments

Images (1)
  • 20170512_111858
Original Post

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×