I got suggestions on what to change on my layout so here's new one!
I'm pretty sure there are some flaws in the layout so help me out in finding them!
Here are some things you need to take note of:
- I am only going with O36 track because I think it is best for a beginner like me!
- I don't need to worry about curves because I am only running Lionchief engines!
- I am using Lionel's Fastrack system.
- I am trying to go cheap here, This whole layout costs $498 for me. (I didn't include the extra track I have)
- I am not good at "Railroad Vocabulary", It took me a bit to realize what spur track meant.
- I am new to O-Gauge Railroading.
- I am using RailModeller 4.1.11 for tracks.
- I am using Paint X for "scenery". (a free drawing software)
- I don't want anything larger than a 4x8 layout.
- The switches are O36.
- I measured the layout, It can fit a 4x7 table so I am prepared to get a table.
- The switches on the bottom is JD2035RR's idea.
- The layout is called "Tyburn Rails" , Tell me you thoughts about the name!
If you would help me out with my layout that would be awesome! Any tips or tricks that will help out my layout will be very appreciated!
Also give feedback on how good or bad the layout is!