Skip to main content

Remember I’ve got that big hole in the middle. I’m going to go with option 3. But remember I run the pantographs on Gg1 and Acela so that’s why I’ll be squeezing it. 

Dave’s right I only have 2 auto switches o-48s in left hand left. Currently I have the switch on the bottom going into the other switch with 2 dead ends not going over any track. Will take a photo tomorrow for you guys.

Robert, something's not adding up. I see extra 10" tracks in each of the ovals, so what you've laid out appears to differ somewhat from the photos we've been working with. Assuming that's the case, here's the best you can do using Option 3. It will require you to add a support as shown. If that goes too close to the gold track, you'll need to adjust the width by replacing 10" tracks with 5", etc., and move the support.

O36-O48

 

Attachments

Images (1)
  • O36-O48

The Atlas 40" bridge is too long with the curves leading into it, but something in the 30" range would fit.

Here are some samples that I found, so I can't vouch for the accuracy. The first is an under arch style, the middle is supposed to be a Lionel double truss bridge and the third is supposed to be an Atlas single truss bridge. Here's a link to Lionel's single truss bridge that is 26 1/8" long, 7 1/2" wide and 12 1/2" tall. Obviously, you'll need to figure out how to support it.

test3test2test1

Attachments

Images (3)
  • test3
  • test2
  • test1
@DoubleDAZ posted:

Came out really nice. Good for you.

Hey Dave,

Hope all is well.
Owe it all to you for your layout help.

I got some new trains and having a few short outs on the opposite side that has the connections. They’re bigger trains but should I think about grabbing a ZW-L or would it better to add more wired connections to the power around the layout?

I’m also going to add some

Last edited by Robert Cushman

How many power connections do you have now? I’m no expert on power, but I would think a single 180 would have enough power to run a train on each loop. I’d have 2 power connections on each loop, potentially another on the inner crossover and 1 on each spur connected to a switch so power could be turned off if you store engines on them. I’d be interested to know if the shorts are in the same area each time.

As far as how I’m doing, we just returned from 10 days at Cape Canaveral FL and a couple days at our daughters in Gainesville GA. We’ll be heading back to GA for a college graduation, some final baseball games and some time on Lake Lanier. We hit a blizzard coming home Thursday and almost didn’t make it through before they closed the freeway. It was slow going, but we made it safe and sound. Our Prius did quite well for its first time in such conditions.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×