during the past two months or so i have read much on this forum about track, etc
some have mentioned problems with track connections , switches , frogs, and a assortment
of problems running this particular train over that particular switch - so - what i have
learned if just enough to "know nothing" - - now the question
i have three MTH engines - a 249E, 263E and a 269E - all freight and passengers are mth
Would i get a better performing system if i used mth track - and switches
i am seriously considering using standard gauge without roadbed
thanks
rdeal