For those that have benchwork and have it topped with Homasote, does anyone know how far beyond the edge of the benchwork the Homasote can be extended to safely support a single train? I'm talking only about a 4' wide piece. My layout is only up for 2 months so the answer may be influenced by whether it's permanent or temp. I'm thinking it might sag OVER TIME, but possibly not just in 2 months.
as always, thanks - walt