Skip to main content

Replies sorted oldest to newest

Good job on the video. You know your railroad well.

If you have to repair the bridge mating corner track again, try cutting through a fresh curve at a 45° angle at the bridge lift point. Then, the bridge piece should settle right down and mate nicely to the table side.

Nothing wrong with running Thomas. I am an old dude and still run him. He's a very useful engine!

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×