i am attaching a photo of a layout I am proposing to build. This is kind of the general.. idea, I’m using 0 gauge tube track. I need a little advice on operating. How many sections would I need to operate this, if I just plan to stop the train manually that trails into the crossover. Ban I get away with only 2, one for each loop?
And if I graduate to making this some type of automatic stopping, how many would I need?
would I need to isolate ot insulate the crossovers for 2 train operations?