Have 11 cars to load. Need additional weight to insure cars push way through Ross turnouts with Tortoise Switch machines attached. *How to load plastic logs provided to create the weight? * alternatively, have cut white pine wood in length and sizes appropriate. What needs to be done to prepare the wood(drying?) to be included on a model rr(address concerns about mould, sap, other concerns). Is addressing the concerns worth the effort?
Original Post