Skip to main content

I am ready to begin building my (last) layout.  Having moved several times in the last 20 years I get about 3 yrs. per layout.  I believe this is the last stop. I am planning for 2 levels.  I know that I will have to add some sidings for industry.  I appreciate your feedback

 

Thanks

 

Doug

 

 

 

 

 

Warwick 8

Attachments

Images (1)
  • Warwick 8
Files (1)
Last edited by Doug N
Original Post

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×