I've finalized the main run around the room tracks. Just the sidings are not yet finalized. I am using Ross TINPLATE # 4 Switches for the 2 track crossovers, 2 K LINE 0-72 Switches, 3 K line 0-42 switches and 3 K Line 0-31 switches. Right now I can run my RailKing Rugged Rails engine and tender on ALL the track with only 1 power connection.
I'll be putting all mt EXTRA K-line track and switches up for sale soon.