I am building a WYE track into my yard. I will be using left and right O-72 RailTrax turnouts and an O-72 WYE turnout. Can someone verify the track sections that I need to complete this WYE configuration? I do not have the software to check this.
My guess is that I will need 2 half O-72 sections to complete the curved portions. And two 3-1/2 straights, one 5 inch straight and six 10 inch straights to complete the straight portion.
Can someone verify this for me?