Well my new layout is finally coming together.  Track work on the main portion 4 X 10 ft table is basically done.

I started wiring the voltage plugs on the switches yesterday.  5 done, 7 to go.

I have 1 power connection to the track and 3 commons.  Every piece of track will power a loco.

I have acquired so far - Milk car and platform, # 456 Coal ramp and hopper car. # 387 coal loader to work with the coal ramp. a sawmill and am bidding on a Log conveyor loader. I also got a rotary aircraft beacon, 2 Coal dump cars and a dumping log car.

I'm hoping to buy a light tower for the 2  siding areas. I have 3 Z-1000 MTH Transformers for power.

The coal ramp and coal loader will go on the 2 ft X 3 ft section on the far end right side of the main table.

 

100_2162

100_2163

Attachments

Images (2)
  • 100_2162
  • 100_2163
Last edited by Larry3railtrains
Original Post

Replies sorted oldest to newest

Thanks to all of you.  I'm busy wiring all 12 switches to a fixed 14V outlet on one of my Z 1000 this afternoon.  Once I get this done, I can hookup the DCS and run the engines at the 18 to20 volts a Z 1000 puts out.

 

Then I'll be wiring up about 4 of the sidings with on off switches and wiring up a few of the switch controllers.  All the switches at the front of the table I'll turn manually.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×