For too Long I have been planning more than running trains.
I have gone from 2 mainlines to around the room to 2 small 4'x'8s and a few others in between. That is one of the bad things about track software.
I think I have come up with a good starting point(again). Actually just can upstairs from laying out the track work.
I have 4 wyes which I thought were going to be my freight yard, but something came to me about a week ago. Use them to create the center reversing part of the layout.
For now I am running conventional but am going to wire it for possible growth into newer things.
I have room on the lower left hand side to run a few more sidings in the future. But I needed to get something up and running before I gave up again.
Thanks for Looking