Skip to main content

I'm building a new layout using realtrax 042 and 031 single level u shape using 3 4x8 plywood and filling in the gaps as needed. Multi 042 switches and want to have 2 main lines, small lake, small yard, some sidings and some room for mth building all modern era trains cars etc.  Please post some ideas

Original Post

Replies sorted oldest to newest

I did think about it. Just not really what I want to do. I don't have any track planing software other than the free one that dosen't have mth track. I Have bought $2000 in track just for a rough start on the floor. When I get my main lines and sides started. I'll know how much wood to buy. I'm on my own here. 

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×