Skip to main content

Hello everyone, I wanted to share quick video of progress on the new layout. The H.O. layout has been completely dismantled and recycled. The new benchwork is up. This curve is one end of the outer main line and it is 0 81. The little curve on the other is end is just for testing and running some trains while waiting on next track order. I am adding the basic track plan also. The lower double main line is pretty much as it will be on the layout. I am still moving thing around with the upper level.

The main line tracks are 0 72 and 0 81 min radius, the upper level as is now is 054.

Attachments

Images (1)
  • trackplan1-1-2022
Videos (1)
First curve of new layout
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×