Skip to main content

Train A runs on the lower level, powered by post A on Level 1. Train B runs independently on level 2 with power from postD on the ZW.

occasionally, train B Must visit the lower level, to pick up supplies And then return to the upper level on the same track

    Should the power source for the train change at the top of the grade or the bottom?  

Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×