Skip to main content

Hello, got a suspended layout in basement 7’ X 48’ Using Menards O gauge track. It has a Crossover 042 curves with 054 curve to crossover. Do you think 14 ga landscaping wire with (6each) 18gauge feeders will be enough. Using a Lionel ZW 275. Will be using a Lionel 260e locos and passenger cars. Thanks

Attachments

Images (2)
  • FEBB4DD6-683B-4AD5-8A05-CF2577026A5F
  • FA390122-A24E-4AD2-90D5-3C5BF10434C5
Original Post

Replies sorted oldest to newest

Hello, got a suspended layout in basement 7’ X 48’ Using Menards O gauge track. It has a Crossover 042 curves with 054 curve to crossover. Do you think 14 ga landscaping wire with (6each) 18gauge feeders will be enough. Using a Lionel ZW 275. Will be using a Lionel 260e locos and passenger cars. Thanks

@Smokeandsteam4me,

Sweeeeeeeet layout.

I like your rigging to the ceiling.

Thanks for sharing the pix,

Mike

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×