I'm getting ready to start building different configurations for fun. I have 3 tables that are 5 x 9, so I can put them in any configuration to make a layout work. I'm considering this for now. I only have one train and have collected tons of track in anticipation of project. I have hopes to add the third part some time in the late winter or spring. I'm looking at something that I can watch on a continuous loop. I don't want to be busy hitting switches yet.
Attachments
Original Post