Skip to main content

All, I want to add a 2% incline/decline to my layout, the base is 1/2" plywood on Mianne frame work.

What or how would you suggest I create the incline? I am thinking it would be difficult to cut foam board and keep a smooth finish.

I just read about Woodland Scenic incline starters, and that seems like the easiest way to do this.  I should have mentioned this section of track is already installed, but I want a small incline/decline in it.  I want to go up 1" and run there for a foot or two, and then back down to zero. 

Thank you,

Aflyer

Last edited by Aflyer
Original Post

Replies sorted oldest to newest

Mike CT posted:

2% grade is 2" rise in 100" of run. 100" is 8' 4".    A 2% up, for 1" rise is a 50" run, leave the other 50" for down, would take 8'4" add your 1' to 2' level in the middle.   10'+ to do this.  

Best wishes with your project.   Mike CT

Thank you Mike, I am going to do this over about a ten foot span, so I will have about four feet of incline, two feet where the track is level, before it starts the down hill slope again for about 4 ft.  I am off to the local HobbyTown.

Thank you for all the replies.

I have ripped out the 10 foot section, added 4 feet of incline, 4 feet of decline, and 2 feet of track that is elevated 1 inch in between.

Slightly above a 2% grade but I think it will be fine.

Waiting for the joint cement I put on it to dry, so I can sand it and get it painted. Then I can put the track back down.

Here are a couple of photo's of the progress.
incline 1

Incline 2

Thanks for looking,
Aflyer

Attachments

Images (2)
  • incline 1
  • Incline 2
Last edited by Aflyer

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×