I have a 8 x 14 space available for an S gauge layout using American Flyer traditional track. I am looking for help on a track plan utilizing traditional AF track and roadbed.. I would like to be able to operate 3 trains at once and incorporate a 90 degree cross over in the plan. Any help appreciated.
Thanks