I have a 5 rail track that I made up that utilizes standard gauge and o gage track that I will be running through the hellgate bridge. Just wondering if anybody has had any issues running their tubular track through the **** gate bridge when trying to run trains with with command.
I know there are insulated sections inside the bridge for the standard gauge but not sure what would happen if the ties are touching the metal portion of the bridge.
Has anyone had any issues with this and if so how did you rectify the issue?
Joe Gozzo