one could get ambitious and over do a incline pretty easily i would imagine. Can not fine any ratios of correct or modest inclines, i have about ten feet of run. I want to be able to achieve enough elevation to create over pass doable? Might be able to stretch that 10' a bit with a curve and then another run of about 7'
Am taping the floor of 'proposed layout' with blue masking tape, will post some photos when it is all taped out and some track circles inside it
have enough track to put down complete 36" circle and some straight track to elongate it maybe