Skip to main content

Replies sorted oldest to newest

Here's a few pictures of my lift out sections.

Photo313Grandson behind the tunnel and inside the mountain.

100_1267 [1280x959)

Building roof opens up

100_1267 [1280x959)

100_1268 [1280x959)

 

100_1936

Section under the white oil tanks lifts up. Has 1-1/2 inch plastic pipe that is attached to a corner of the  lift out section which is  inside 2 inch plastic pipe that is attached to the layout leg.

100_1936

Attachments

Images (4)
  • Photo313: Grandson inside mountain and behind tunnel.
  • 100_1267 (1280x959): Roof of building opens up
  • 100_1268 (1280x959): Building with roof open
  • 100_1936
Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×