Skip to main content

After receiving an overwhelming number of views on the "trailing v. facing point" demonstration...I've done another operational video demonstration.

I have other future operations videos in the works already.

PLEASE SUBSCRIBE TO MY YOUTUBE CHANNEL.

Check out:  Loads In / Empties out!  Talked about but rarely demonstrated on video.

https://www.youtube.com/watch?v=-4piKNB40KE&t=4s

Original Post

Replies sorted oldest to newest

John, I can't find my pix at the moment but I've also done something similar on a couple of 'mushroom' layouts I've worked on.  Imagine an industry stuck in the middle of a scenic divider with one half on one side and the other half on the other side.  Then put two through tracks through it.  Empty / fill.  Russ

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×