Skip to main content

     I am adding a second level to my layout.  Lionel remote control switches are powered on the 1st level by a separate transformer, & controlled by SC-2s using Legacy command system.  That level is powered by two 180 watt bricks connected to a TPC 400.  It is larger than the proposed 2nd level with 5 trains consisting of heavyweight passenger cars.

     My plan is to power the 2nd level with 1 or 2 180 watt bricks & a TPC 300.  It will have only 1 traditional / conventional freight train operating on it.

     My questions are:

1) can I power the switches on the 2nd level with the same power source as powers the switches on the 1st level?

2) if I do, will the same switch power souce for both levels cause a problem since there will be two different track power sources?

Original Post

Replies sorted oldest to newest

Post
×
×
×
×
Link copied to your clipboard.
×
×