Skip to main content

My original 6x9 (visible on the control panel) had too many first time errors to fix so I decided to tear it out and start over. The main feature of both the old and new layouts allows for two trains to run at the same time. I have a house full of kids so letting everyone have their turn, as quickly as possible, is a must. I also enjoy PW style accessories and the redo will allow additions like the coal loader that simply wouldn't fit on the previous layout. (Sure eats up a lot of real estate.) I have plans to add barrel loaders and more. The redesign will incorporate the horse and cattle corals from the previous layout and will add a milk car platform.

The outside loop is O-42, the passing siding is O-31 and the inner figure 8 is O-27. The new track plan is visible on a sheet of paper in the third photo. Conventional control only.





Since the main layout is down for a while, I put together a little loop in my office to give us something to do in the mean time. Here's a little video I call "Getting the Most from My Lionel Layout."
http://www.youtube.com/watch?v...ture=player_embedded
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×