Skip to main content

For the past year and a half, I have been designing potential track plans for my new layout. These plans are the ones that made it to completion on the computer. My first plans, up until P&W Revision 25 (Realtrax) were all done with Ross track and switches, with Gargraves flextrack to close gaps. The reason all later plans were switched to Realtrax was due to my CFO not wanting to invest in all new track (I already have Realtrax on my current layout). Eventually though, I finally settled on a final plan (The Plan). BTW, a lot of my early plans were done without full knowledge of the grades toy trains can handle.

p&w revision 1

p&w revision 2

P&W Revision 3

p&w Revision 4

P&W REVISION 7

p&w revision 9

p&w revision 11

p&w revision 12

P&W revision 13-1

P&W Revision 14

p&w revision 18

P&W revision 21

P&W REVISION 23 HARBOR SNAPSHOT

p&w revision 23

p&w revision 24

p&w revision 25 realtrax

p&w revision 26

p&w revision 27

p&W revision 28

p&W revision 29

random mutations 6

RANDOM MUTATIONS

random mutations-p&w revision

coal, p&w 5

The Plan

Attachments

Images (25)
  • p&w revision 1
  • p&w revision 2
  • P&W Revision 3
  • p&w Revision 4
  • P&W REVISION 7
  • p&w revision 9
  • p&w revision 11
  • p&w revision 12
  • P&W revision 13-1
  • P&W Revision 14
  • p&w revision 18
  • P&W revision 21
  • P&W REVISION 23 HARBOR SNAPSHOT
  • p&w revision 23
  • p&w revision 24
  • p&w revision 25 realtrax
  • p&w revision 26
  • p&w revision 27
  • p&W revision 28
  • p&W revision 29
  • random mutations 6
  • RANDOM MUTATIONS
  • random mutations-p&w revision
  • coal, p&w 5
  • The Plan
Original Post
Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×