Skip to main content

So I'm tinkering with my layout and decided to replace a switch.  In replacing a switch, I thought, maybe I could create a small siding that would rejoin the main line. My only problem, is that the siding would be relatively small.  I believe I could fit my SW-9 and a car, maybe two, on the siding.  I placed an SD 40-2 on the rail in the pic and it pretty much takes up all the space.  So my question is: Is it worth it?  I don't have any other siding on this layout, just a four track yard, an engine yard and loops.  So I'm torn. Looking for a little guidance.

The pic here is where the siding would be.  You can see in the background where I removed the Gargraves switch.  I want to put a Ross there.  I could squeeze another switch in the foreground just at the end of the curve.

20170311_091045

The alternative, for me, would be to take that siding track out and put in scenery.

Attachments

Images (1)
  • 20170311_091045
Original Post

Replies sorted oldest to newest

As Bob says above a siding is an operational element, but it also can be a scenery element.  A team track with trucks to transfer cargo from various cars including hoppers. 

I've noticed that the corners of the layout are largely unused except for mountain scenery.  If you are using large diameter curves there can be three of more feet along the edge.  I've been planning on putting a Lionel grain elevator in one corner to supply a larger Korber elevator.

Jan

Thanks for the input. I have a couple of industrial sidings, so I am accomplishing that bit of scenery.  This siding would run right next to my large yard, leaving little room for any buildings.  This would be a passing siding.

The curve entering the straightaway at the foreground of the photo is about a 40" radius (it's flex track), so I don't think I can put a curved switch in, although I would love to if I could.

flanger posted:

Well I'm very opinionated where sidings are concerned. I'm an operator by choice and see that siding as a perfect opportunity to add a small customer or a team track to spot a car or two. A railroad doesn't exist to merely run trains...it needs customers.

Bob

I agree with Bob and others who suggest adding a siding.  You posted that you have a large 4 track yard so I suppose you have a run around track for that?  

pennsynut posted:
flanger posted:

Well I'm very opinionated where sidings are concerned. I'm an operator by choice and see that siding as a perfect opportunity to add a small customer or a team track to spot a car or two. A railroad doesn't exist to merely run trains...it needs customers.

Bob

I agree with Bob and others who suggest adding a siding.  You posted that you have a large 4 track yard so I suppose you have a run around track for that?  

Sadly, no.  I just put a Ross 4-way to use, so it's one track in and out.  I figured it was better than not having a yard.

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×