Skip to main content

Replies sorted oldest to newest

First pictures were Tuesday, 

These are from Wednesday added ground cover and trees

20200414_143122

20200414_143057

Today Thursday  was a good day,  wired accessories,  installed them ,added a few cars slowly getting there

20200416_112731

20200416_112715

Here's my construction supervisor 

OREO20200414_16305220200309_101341

I give her a chew so she'll pass my inspections while looking the other way. 

OREO ia a 10 year old Beagle that we adopted last September.  My best friend!!!!!!!!!.😊

 

Attachments

Images (6)
  • 20200414_143122
  • 20200414_143057
  • 20200416_112731
  • 20200416_112715
  • 20200414_163052
  • 20200309_101341

I had a great day. Able to build deck for mountain (12" clearance) , placed some accessories on platform,  

20200423_172237

moved power plant to corner

20200423_172327

Added gas station and post office with new facia Menards building by mountain

20200423_172246

then worked on cow pond by oil pump on old farm land.

20200423_172257

Cows will be grazing here, going to distress silo and barn 

20200423_172314

then I went outside and worked in rose garden for a couple of hours.

Attachments

Images (6)
  • 20200423_172237
  • 20200423_172246
  • 20200423_172327
  • 20200423_172246
  • 20200423_172257
  • 20200423_172314

Great post, thank you     My farm, an older, Ertl, farm kit, from a nephew.  My sweetheart did the barn paint, (control panel, upper left corner, click on slideshow), with air brush work   Fence was done with 1/4" wood dowel and piano wire.    Cow pies were my wife's idea.   The vegetable garden is a focal point.  

Detail material/products, Woodlands Scenic, and Scenic Express.  

Last edited by Mike CT

Oreo is a different type of BEAGLE.  My best friend.

Today we started placing Woodland  Scenics Ready Rock on tunnel  and mountain then added clump foliage,  sprinkles of turf & dirt.

I wanted tunnel entry high enough so engines with Pantagraph could go in with no restrictions,  raised them 1.25 inches to 8.25 inches.20200505_163204

The right side tunnel has a 9.25 clearance for Std Gauge trains

 

Attachments

Images (2)
  • 20200505_163119
  • 20200505_163204

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×