I just received my Power and Light Building. To my surprise the section of the building where the cars go through has a floor so as to prevent the just slipping that section over the siding. Has anyone sawed the floor so as to allow the slipping over the track versus ripping up the track and relaying the track through the building?
Original Post
Replies sorted oldest to newest
I removed my brace without any problems.
Ken M
. . . and you can't tell by looking at you, Ken.
Good morning Jim. I just grabed my American Power and Light building and there are 9 screws that attached to the building. I know that John in Lansing, Ill said there was at least six screws. but there are 9 screws. Thanks John I did not want to jump in and not mention you but I wanted to let Jim know the total amount. Scot
Thanks all for chiming in. I will be removing the floor and installing the building on my Elmira Branch Railroad as place to move my Coal Cars to using ShipIT.
I do wear glasses but I would have seen that if it were there regardless. Lol
Add Reply
Sign In To Reply