Here we are-Still having a good time! .. Glass work is complete-(or should I say DRAMA work?).....overhead cranes are built and installed-except for the wheels which will ride on the crane tracks, still not here yet. Each step is about the same process:
Design-cut patterns-mock up-break back down-sand/detail/paint-re assembly(pin nail-glue-clamp) detailing and install. Oh yea "sometimes" in my case tear back apart fix mistakes and re install.
In some extreme cases-That WONT work-Throw in junk pile-start over.
Next steps: add detail to the interior-wire-install roof tops-add exterior detail
I have decided I will make and install a 30" service platform with stairs and railings between 2 of the engine stalls.
About 140 hours into this project.
PS: clamps, always clamp drama this includes:
1-its not long enough!
2-this is way to long need shorter one!
3-to big!
4-to small
5-I need 3 more like "this one"
6-send wife to Home Depot on emergency clamp run-comes back with wrong ones and clueless.Blames "delerious" guy that helped her.
can't take ourselves too serious.
Thanks for looking, Nick