Well to say I have been busy over the past week or so would be quite the understatement. With the goal of having trains running by Christmas Eve, there was certainly a lot of work to be done over the week and a half since my last post and today. The construction of the two was completed yesterday (12/21) with two grass mats being set in place. Normally, I would like to do the grass but, with a limited amount of time before I go back to school it was the easiest and cheapest method. Not perfect but better than nothing.
After putting the grass mats into place I began to screw done the track. When trying to install the third table (far left) the only way the three tables would fit is if there were turned adjacent to the window, meaning all the track had to be relaid.
I began laying track on the newer section to see what it would look like. Somehow, I still need to pick up a few more pieces of track, so that will be a quick trip to my LHS tomorrow. The wood on the table has been cut more of on an angel to look nicer and to provide more access to the doorway.
Expect a new YouTube video up tomorrow with trains running (hopefully). For now, you can check it out here.