I'm sure many of you have been in the same predicament that I'm stuck in now. I have a great start to my layout (lower deck) with 6 track and 4 track freight yards, engine turn table, coaling/water siding and all enclosed in a loop that feeds onto a double mainline. But trying to wire so many switches and then work on the double mainline up to the second deck is where I'm stuck. Like all of us, I keep changing my mind and it stops me from moving onto the next step... what ever that should be.
Any advice or help in moving off "first base" and getting some real trains running?
Like you, I'm frustrated but looking forward to some serious O Gauge fun.
Ted