This is the new and improved version. Built with parts from HD, Lowes, etc. (I’ve installed 4 of the earlier version)
And yes that is an 0-72 curve into the bridge….
These are the temporary bridges that will be replaced.
They will have MTH Steel arched bridges attached and look like this..(these were lift out ‘s w/wiring harnesses/plugs)