Skip to main content

Just starting a new layout. In the past I have used screws to fasten track down. I drill a hole in the G.G. tie and drive a small screw. i am wondering if there is a better way? What does everyone else do?

This may well be my last layout build so I want to get it right the first time.

Thanks for your input.

Original Post

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×