I am setting up a Layout under my Christmas tree…it is two 5x5 sections of foamboard that connect together, with a hole in the middle to go around the tree. It’s extremely difficult for me to connect the track and line everything up behind the tree; there isn’t a lot of room to maneuver and snap the track together.
is there a way for me to remove the pins on the track where it meets, so that they line up? Thinking this is similar to how a lift up/out bridge works. Is it as simple as having multiple power line runs to the different sections of track, to ensure that there’s no power loss?
appreciate any advice/tips/tricks. Thanks!