I am installing new GarGraves track. I have a simple trolley line that is a bump & go with one left hand turnout. The turnout takes the trolley over to a bridge where I am using trestle track. I also have power leads at all three center rails on the turnout. However when power is applied I get a short on the turnout side. Any suggestions please?
Pine Run
Andy